MINISTRY OF WATER & ELECTRICITY



SGCO had been awarded contracts for “Hydrogeological, Geophysical and Geological Study” with:

  • Directorate of Water of Aseer Region – Abha for duration of Six (06) Years.
  • Directorate of Water of Eastern Region – Dammam for duration of Two (02) Years.
  • Directorate of Water of Madina Region – Madina for duration of Two (02) Years.


Implementation of Monitoring System to the Water Network in Madina May 2011 to May 2012 SGCO Constructed 33 Chambers located across pipe lines network.